Guide to Evaluating Split Bolt Connector Quality

Question Circle

Product Selection and Technical Support.

selection criteria

Details Required to Select Split Bolt Connectors

1
Step 1

Type

Select the standard series, the R-Series, or the Servit Post series.

2
Step 2

Cable size

Share the conductor cross section in mm². The standard series covers 10 mm² to 500 mm², the R-Series covers 16 mm² to 185 mm², and the Servit Post series covers 25 mm² to 120 mm².

3
Step 3

Stud requirement

For Servit Post connectors, confirm the stud size. M10 studs cover 25 mm² and 35 mm², M12 studs cover 50 mm² to 120 mm², and stud length is 30 mm.

4
Step 4

Material form

Select extruded or forged brass. The standard series uses brass section to BS2874 and the R-Series and Servit Post series use brass rod.

5
Step 5

Finish

Select electro-tinned, untinned, or copper plated.

Learn From Our Engineers

Technical Guides and Resources

video

Split Bolt Connectors - 3 UL Tests that Reveal Quality

Split Bolt Connectors - 3 UL Tests that Reveal Quality

FAQS

Frequently Asked Questions

Find quick answers to common questions about our programs, admissions, eligibility, and application process to help you move forward with confidence.

It is a slotted bolt body that holds two or more conductors in a channel, with a nut that clamps them together. You install it with a wrench and no crimping tool, and you can open it again. That makes it the choice for taps, grounding connections, and repairs on sites where hydraulic tools are not practical.
They join earth conductors to each other, to earth rods, and to bonding points in the down conductor path, including fence and structure bonding. The connection has to carry fault and lightning current, so the clamping force and contact area matter more than they do on a routine wiring joint.
That is what the static heating test proves. Rated current runs through the installed connector until the temperature stabilises, and the rise must stay within 50°C above ambient under UL 486A and 486B. A joint that stabilises inside that limit is not shedding energy as heat at the contact.
Two tests, run on the same sample that went through heating. The secureness test hangs the specified weight on the conductor and rotates the assembly for 30 minutes, and the conductor must not slip, loosen, or shift. The pull out test then applies increasing force until the minimum figure in the standard is reached, with no strand breakage or damage to the connector.
Strip the conductor to the length the connector needs, seat the conductors fully in the channel, and tighten the nut to the torque on the datasheet. Under torque leaves resistance high, and over torque damages the strands. On aluminium conductors, brush the strands and apply joint compound before assembly.

Download Catalogue